Professional competence

With a technical team which is regularly trained with many years of experience, along with the dedication to work, we confident to say we can meet all of customer requirements.

  •  Design, supply and construction of the project inclusive of electricity, water, air-conditioning, lightning proof and environmental treatment equipment.
  •  Consulting, design, supply and construction of cooling systems, electric motors, electronics, systems and boiler pressure.
  •  Design, supply and construction of systems for liquefied gas pressure and gas industry.
  •  Training and transfer of new technologies in the field of air conditioning and automation.
  •  Training and transfer of new technology new material.
  •  Supply of machinery and industrial equipment.
  •  Provide all kinds of building materials

1. Total number of years’ experience in the construction and installation of air conditioning and ventilation

Nature of work

Experience

1. Design, supply and installation of air-conditioning air-cooling type cooling water (CARRIER, Trane, YORK)

05 years

2. Design, supply and installation of air-conditioning system intelligent VRV - DAIKIN, HITACHI, TOSHIBA, VRF system - FUJITSU, GENERAL, ...

05 years

3. Thiết kế, cung cấp và lắp đặt thi công hệ thống đường ống gió cấp không khí lạnh, cấp khí tươi, hút thải công nghiệp, ...

05 years

4. Design, supply and installation of air conditioning systems Daikin VRV type, Multi - V LG and generation MPS - Multi LG

05 years

5. Design, supply and installation of air-conditioning cooling type direct cooling air-conditioning Local - LG, CARRIER, FUJITSU, PANASONIC, ...

05 years

 2. The list of equipment construction:

Description of device type

The number of each type

In production

Owned

Tenant

Operational capacity

Welding power 1-phase and 3-phase type

2

2007

2

-

38 kW

Ultrasound Weld

1

2002

1

-

 

O2 gas welding machine - Butane

2

2002

2

-

 

Ministry of Gas Pipe Bending

2

2010

4

   

F22,22

 

Ministry nong - flared copper pipe

6

2010

8

 

F19,25

2H-125 drilling machine (drilling concrete and steel)

6

2007

4

-

2.2kW

Rod hydraulic punches

1

2009

1

-

350 mm2

NTT Ministry bending cables

1

2008

2

-

F350

Piston pumps water pressure pump

1

2007

1

-

0.7kW

Air compressor

1

2008

1

-

0.5kW

Grinding, cutting

10

2009

8

-

2kW

Hand Drill, Drill Concrete

12

2009

8

-

 

Hoist, winch

2

2009

3

-

 


 3. 
Human resources companies directly involved in construction:

Qualifications

Number of people

 

Refrigeration Engineer

10

 
 

Mechanical Engineer

4

 
 

Labor Protection Engineer

1

 
 

Automation Engineer

3

 
 

Bachelor of Economics

2

 
 

Economic College

2

 
 

Refrigeration college

10

 
 

4/7 to 5/7 mechanic

6

 
 

Refrigeration workers

30

 
 

 

Newer news items:
Older news items:

Projects

Dự án Vinhome Park Hill

Dự án Vinhome Park Hill

 Vinhome Park Hill là công trình tiếp theo trong chuỗi dự án nhà ở của tập đoàn VinGroup mà ME Group chịu trách nhiệm chính trong việc khảo sát, thiết kế thi công hệ thống thông gió, điều hòa không khí công nghiệp và dân dụng.   

Online support

Sales Consultant

Hotline:
+84-4 3.632 1295

Visit Counters

mod_vvisit_counterToday1508
mod_vvisit_counterThis week2364
mod_vvisit_counterThis month19549
mod_vvisit_counterTotal number24549

Today: 23 Oct, 2017